Liberia Laterite - Excavation / laterite trench work
|
03 - Concrete |
12.45 |
M3 |
$5.40 |
$6.00 |
$7.20 |
$74.70 |
N/A |
|
Liberia Laterite - Gravel in rubble trench
|
03 - Concrete |
12.45 |
M3 |
$31.50 |
$35.00 |
$42.00 |
$435.75 |
N/A |
|
Liberia Laterite - Concrete ring beam
|
03 - Concrete |
3.11 |
M3 |
$99.00 |
$110.00 |
$132.00 |
$342.10 |
N/A |
|
Liberia Laterite - Rebar in ring beam
|
03 - Concrete |
295.68 |
KG |
$0.95 |
$1.05 |
$1.26 |
$310.46 |
N/A |
|
Liberia Laterite - Compacted gravel under floor
|
03 - Concrete |
11.54 |
M3 |
$31.50 |
$35.00 |
$42.00 |
$403.90 |
N/A |
|
Liberia Laterite - Leveling sand under pavers
|
03 - Concrete |
2.89 |
M3 |
$22.50 |
$25.00 |
$30.00 |
$72.25 |
N/A |
|
Liberia Laterite - Pressed floor pavers
|
03 - Concrete |
1223.0 |
SF |
$0.41 |
$0.45 |
$0.54 |
$550.35 |
N/A |
|
Liberia Laterite - Pressed laterite wall blocks
|
04 - Masonry |
15885.04 |
EA |
$0.09 |
$0.10 |
$0.12 |
$1588.50 |
N/A |
|
Liberia Laterite - Structural timber / joists / trusses
|
06 - Wood, Plastics, and Composites |
2.77 |
M3 |
$292.50 |
$325.00 |
$390.00 |
$900.25 |
N/A |
|
Liberia Laterite - Aluzinc roofing sheet
|
06 - Wood, Plastics, and Composites |
153.69 |
M2 |
$6.12 |
$6.80 |
$8.16 |
$1045.09 |
N/A |
|
Liberia Laterite - Aluminum jalousie windows
|
08 - Openings |
8.72 |
EA |
$112.50 |
$125.00 |
$150.00 |
$1090.00 |
N/A |
|
Liberia Laterite - Copper house wire - base load
|
26 - Electrical |
296.59 |
LF |
$0.77 |
$0.85 |
$1.02 |
$252.10 |
N/A |
|
Liberia Laterite - PVC electrical conduit / chase
|
26 - Electrical |
191.91 |
LF |
$0.41 |
$0.45 |
$0.54 |
$86.36 |
N/A |
|
Liberia Laterite - Switch / socket devices
|
26 - Electrical |
24.43 |
EA |
$1.08 |
$1.20 |
$1.44 |
$29.32 |
N/A |
|
Liberia Laterite - Distribution box / panel - modest load
|
26 - Electrical |
1.0 |
EA |
$16.20 |
$18.00 |
$21.60 |
$18.00 |
N/A |
|
Liberia Laterite - LED light fittings
|
26 - Electrical |
13.96 |
EA |
$4.95 |
$5.50 |
$6.60 |
$76.78 |
N/A |
|
Liberia Laterite - PPR water supply pipe
|
22 - Plumbing |
52.34 |
LF |
$0.26 |
$0.29 |
$0.35 |
$15.18 |
N/A |
|
Liberia Laterite - PVC waste / vent pipe
|
22 - Plumbing |
34.89 |
LF |
$1.08 |
$1.20 |
$1.44 |
$41.87 |
N/A |
|
Liberia - Bio-digester system complete
|
22 - Plumbing |
1.0 |
EA |
$405.00 |
$450.00 |
$540.00 |
$450.00 |
25C403 |
|
Liberia Laterite - Lavatory / faucet set
|
22 - Plumbing |
1.0 |
EA |
$49.50 |
$55.00 |
$66.00 |
$55.00 |
N/A |
|
Liberia Laterite - Shower set / drain hardware
|
22 - Plumbing |
1.0 |
SET |
$31.50 |
$35.00 |
$42.00 |
$35.00 |
N/A |
|
Liberia Laterite - 500L roof water tank
|
22 - Plumbing |
1.0 |
EA |
$135.00 |
$150.00 |
$180.00 |
$150.00 |
N/A |
|
Liberia Laterite - Fasteners / anchors / misc hardware
|
01 - General Requirements |
1.0 |
LOT |
$162.00 |
$180.00 |
$216.00 |
$180.00 |
N/A |
|
Liberia - Indoor kitchen package (hookups + fixtures)
|
11 - Equipment |
1.0 |
LOT |
$405.00 |
$450.00 |
$540.00 |
$450.00 |
N/A |
|
Liberia Laterite - Decorative removable wood chase covers
|
26 - Electrical |
191.91 |
LF |
$1.26 |
$1.40 |
$1.68 |
$268.67 |
N/A |
|
Liberia Laterite - Decorative removable water-supply chase covers
|
22 - Plumbing |
52.34 |
LF |
$1.26 |
$1.40 |
$1.68 |
$73.28 |
25C410 |
|
Liberia Laterite - Wet-wall / boxed plumbing chase allowance
|
22 - Plumbing |
1.0 |
LOT |
$58.50 |
$65.00 |
$78.00 |
$65.00 |
N/A |
|
Liberia Laterite Labor - Set out, excavation, and rubble trench
|
01 - General Requirements |
1.0 |
LOT |
$79.20 |
$88.00 |
$105.60 |
$88.00 |
N/A |
|
Liberia Laterite Labor - Concrete ring beam and steel placement
|
01 - General Requirements |
1.0 |
LOT |
$129.60 |
$144.00 |
$172.80 |
$144.00 |
N/A |
|
Liberia Laterite Labor - Floor base and pavers
|
01 - General Requirements |
1.0 |
LOT |
$129.60 |
$144.00 |
$172.80 |
$144.00 |
N/A |
|
Liberia Laterite Labor - Wall block erection
|
01 - General Requirements |
1.0 |
LOT |
$226.80 |
$252.00 |
$302.40 |
$252.00 |
N/A |
|
Liberia Laterite Labor - Roof framing and sheeting
|
01 - General Requirements |
1.0 |
LOT |
$216.00 |
$240.00 |
$288.00 |
$240.00 |
N/A |
|
Liberia Laterite Labor - Window and door installation
|
01 - General Requirements |
1.0 |
LOT |
$64.80 |
$72.00 |
$86.40 |
$72.00 |
N/A |
|
Liberia Laterite Labor - Electrical rough-in and trim
|
01 - General Requirements |
1.0 |
LOT |
$81.00 |
$90.00 |
$108.00 |
$90.00 |
N/A |
|
Liberia Laterite Labor - Plumbing and sanitary install
|
01 - General Requirements |
1.0 |
LOT |
$81.00 |
$90.00 |
$108.00 |
$90.00 |
N/A |
|
Liberia Laterite Labor - Semi-open kitchen assembly
|
01 - General Requirements |
1.0 |
LOT |
$43.20 |
$48.00 |
$57.60 |
$48.00 |
N/A |
|
Liberia Laterite Labor - Punch list / cleanup / handover
|
01 - General Requirements |
1.0 |
LOT |
$21.60 |
$24.00 |
$28.80 |
$24.00 |
N/A |
|
Liberia Laterite Labor - Site supervision
|
01 - General Requirements |
1.0 |
LOT |
$252.00 |
$280.00 |
$336.00 |
$280.00 |
N/A |
|
Liberia - Outdoor traditional kitchen
|
11 - Equipment |
1.0 |
LOT |
$247.50 |
$275.00 |
$330.00 |
$275.00 |
N/A |
|
Liberia - Contingency / misc allowance
|
01 - General Requirements |
1.0 |
LOT |
$112.50 |
$125.00 |
$150.00 |
$125.00 |
25C430 |
|
Liberia Laterite - Lime wash exterior finish
|
09 - Finishes |
1120.0 |
SF |
$0.68 |
$0.75 |
$0.90 |
$840.00 |
N/A |
|
Liberia Laterite - Interior lime wash
|
09 - Finishes |
1680.0 |
SF |
$0.68 |
$0.75 |
$0.90 |
$1260.00 |
N/A |
|
Liberia Laterite - Wood doors
|
08 - Openings |
3.0 |
EA |
$81.00 |
$90.00 |
$108.00 |
$270.00 |
N/A |